News

ENGINEERING by ENGIE Axima – Episode 2

June 2019

Iconic references : Institut Hospitalo-Universitaire de Marseille

This smart building was shaped by the Design, Completion, Operation & Maintenance teams. Our engineering teams were involved pre and post sale for overall management of the HVAC batches, plumbing, fluids and maintenance. This was a team effort alongside our sales staff in a challenging and highly technical environment where containment must be fully controlled.