VENTILATION AND AIR CONDITIONNING OF THE LASER MEGAJOULE RESEARCH FACILITY
Laser hall: treated air flow 4 x 600,000 m3/h ISO 8
14 process fluids produced and distributed (including primary vacuum
and liquid nitrogen) from ISO 4 to ISO 8
Experience hall: 2 independent nuclear ventilation systems (permanent and temporary) - overall throughout 320,000 m3/h - ISO 7 and ISO 8 treatment by 16 independent recyclers (beginning recycled 1.5 million m3)
Facilities Building: cold capacity 22 MW - warming capacity 12 MW - steam capacity 7.5 tonnes
We have a long and recognized nuclear expertise.
We developed a multi-disciplinary approach between the various entites of the Engie Group (HVAC, Piping, Electrical), that are key to this tight project with lot of coactivity.
CEA, historical client, of ENGIE Axima.